PRE-FIRE PROTECTION
EARLY WARNING SYSTEM FOR THE POSSIBILITY OF FIRE
Our system offers advanced functionality for early warning of the possibility of fire, which significantly increases the level of safety in industrial plants. Thanks to the use of modern monitoring technologies, our system allows you to effectively manage work that carries the risk of fire, minimizing the risk of accidents.
How it works?
MONITORING THE LOCATION OF WORKS
The system uses radio transmitters (beacons) placed near the workplace. The beacons send signals to employees’ mobile devices, which are connected to the server via a communications network.
Mobile work permits
Before starting work, a worker sends an e-permit request using his or her mobile device, including information about the worker’s identity, working hours and location.
The server processes the request and issues an e-permit if all requirements are met.
REAL-TIME WORK MONITORING
Once an e-authorization is issued, the system monitors the location of mobile devices in real time, determining whether employees are present at the workplace, have moved away or left the work area.
(ALARM) If it detects that a worker has left the work area, an alarm is generated, informing the appropriate people of the potential danger.
POST WORK SURVEILLANCE
After the work is completed, the system continues to monitor the work area for a specified period of time (individually set, e.g., 30-60 minutes) to ensure that no fire has occurred.
If the system detects the absence of mobile devices in the workplace after monitoring, a second alarm will be generated.
Case study
Check out the practical application of our advanced early warning system for the possibility of fire.
PRE-fire Protection
Modern monitoring and process automation technologies make it possible to effectively manage work with a higher risk of fire.