Nadajnik ble 52 standard

iBeacon BLE 5.2

165,00 195,00  +VAT

The iBeacon BLE 5.2 transmitters are state-of-the-art devices that use Bluetooth Low Energy (BLE) technology to transmit radio signals in the 5.2 standard. Their small size and high energy efficiency make them ideal for industrial hall applications, asset tracking and indoor navigation systems.

InnerWeb® BLE 5.2 Radio Beacon – professional transmitter for industrial applications

Key Benefits

  • State-of-the-art Bluetooth technology: Equipped with BLE 5.2 technology, the InnerWeb® beacon provides exceptional data transmission performance and low power consumption for reliable, energy-efficient communication.
  • Highly robust: With an IP 65 rating, the device is fully protected against dust and water jets, ensuring reliability in harsh industrial environments.
  • Ease of use: An external on/off switch provides ease of use and quick access to transmitter functions without the need for disassembly or additional tools.
  • Advanced protection: the transmitter is protected from mechanical damage thanks to the front cover and oil-resistant NBR seals, ensuring a longer life of the device.
  • High-quality mounting: INOX stainless steel mounting screws guarantee the durability and stability of the installation under all conditions.
  • Industrial specification: Designed for industrial applications, the transmitter is rated for extreme temperatures from -40 °C to 85 °C, making it suitable for use in the harshest environments.
  • Bluetooth Low Energy: Using Bluetooth Low Energy (Bluetooth 5.2) technology, the transmitter is not only energy-efficient, but also provides long-lasting operation on a single power source.
  • Data security: Password protection against unauthorized updates to the transmitter’s firmware protects data from unwanted changes.

Dane Techniczne:

  • Radio operation: 2.4 GHz
  • Frequency: 100-1000 ms
  • Power: 4-(-20) dBm

Safety and Security:

Password-protected from firmware updates, InnerWeb® radios provide exceptional protection of data and devices from unauthorized access, which is key to ensuring continuous operation of industrial systems.

Ideal for industry:

Designed for ruggedness and reliability in extreme industrial environments, this transmitter is an ideal choice for companies looking for effective and durable communication in their operations.

Purchase includes:

  • 1x InnerWeb® BLE 5.2 transmitter
  • Set of fixing screws INOX
  • Instructions for use and installation