Nadajnik ble 52 atex

iBeacon BLE 5.2 ATEX

285,00  +VAT

The iBeacon BLE 5.2 transceivers are state-of-the-art devices that use Bluetooth Low Energy (BLE) technology to transmit radio signals in the 5.2 standard. Their small size and high energy efficiency make them ideal for industrial hall applications, asset tracking and indoor navigation systems.

InnerWeb® BLE 5.2 Radio Beacon – a professional transmitter for industrial applications with ATEX certification

Key features:

  • State-of-the-art Bluetooth technology: Equipped with BLE 5.2 technology, the InnerWeb® beacon provides exceptional data transmission performance and low power consumption for reliable, energy-efficient communication.
  • Highly robust: With an IP 65 rating, the device is fully protected against dust and water jets, ensuring reliability in harsh industrial environments.
  • Ease of use: An external on/off switch provides ease of use and quick access to transmitter functions without the need for disassembly or additional tools.
  • Advanced protection: the transmitter is protected from mechanical damage thanks to the front cover and oil-resistant NBR seals, ensuring a longer life of the device.
  • High-quality mounting: INOX stainless steel mounting screws guarantee the durability and stability of the installation under all conditions.
  • Industrial specification: Designed for industrial applications, the transmitter is rated for extreme temperatures from -40 °C to 85 °C, making it suitable for use in the harshest environments.
  • ATEX certification for hazardous areas: With ATEX certification, the radio beacon is approved for use in explosive zones 2 (gases) and 22 (dust), guaranteeing safety and compliance with strict safety standards.
  • Bluetooth Low Energy: Using Bluetooth Low Energy (Bluetooth 5.2) technology, the beacon is not only energy-efficient, but also provides long-term operation on a single power source.
  • Data security: Password protection against unauthorized updates to the transmitter’s firmware protects data from unwanted changes.

Technical data:

  • Radio operation: 2.4 GHz
  • Frequency: 100-1000 ms
  • Power: 4-(-20) dBm

Safety and Security:

Password-protected against firmware updates and ATEX-certified, the InnerWeb® radio beacon provides exceptional protection for data and devices against unauthorized access, which is critical to ensuring the continued operation of industrial systems in hazardous areas.

Ideal for industry and explosive zones:

Designed for ruggedness, reliability and safety in extreme industrial environments and hazardous areas, this transmitter is an ideal choice for companies looking for effective and secure communications.

Purchase includes:

  • 1x InnerWeb® BLE 5.2 beacon with ATEX certification
  • Set of fixing screws INOX
  • Instructions for use and installation